A pre-shipment inspection follows a set procedure. The inspector counts the goods, draws a random sample, checks each piece, runs simple tests and writes a report. Knowing each step helps you prepare your supplier and get a fair result the first time.
This guide walks through the full procedure and ends with a checklist you can copy into your own pre-shipment inspection form.
Before the Inspection Day
Good inspections start with good preparation. Most failed visits come from missing information, not bad goods.
Step 1: Book the date
Book the inspection when at least 80 percent of the order is finished and packed. Give the inspection team about a week of notice. Confirm the factory address and a contact person.
Step 2: Share the reference documents
Send the inspector everything they need to judge the goods:
- Purchase order with quantities by style, colour and size
- Tech pack with the size chart and tolerances
- Approved sample or photos of the approved sample
- Label and packing instructions
- Your AQL levels for critical, major and minor defects
- Any special tests, such as colour fastness or needle detection
Step 3: Agree the checklist
Agree a written checklist with your supplier before the visit. This avoids arguments about what “good” looks like on the day.
On the Inspection Day
Step 4: Opening meeting
The inspector meets the factory team, explains the plan and confirms the goods are ready. If less than 80 percent is packed, the inspector notes it in the report.
Step 5: Quantity check
The inspector counts the finished and packed goods against the purchase order. They check carton numbers, carton marks and the size and colour mix.
Step 6: Random sampling
Cartons are picked at random from the whole lot, not just from the front of the stack. Pieces are then drawn from those cartons. The sample size comes from the AQL tables in the ISO 2859-1 sampling standard. For an order of 3,000 pieces at General Inspection Level II, the sample is 125 pieces.
Step 7: Workmanship check
Every sampled piece is checked for visible defects. Common garment defects include:
- Broken or skipped stitches
- Open seams and loose threads
- Stains, holes and fabric flaws
- Shade differences between panels
- Uneven hems, pockets or collars
Each defect is marked as critical, major or minor.
Step 8: Measurements
The inspector measures key points on several pieces per size. They compare each point with your size chart and tolerance. Results go into a measurement table in the report.
Step 9: On-site tests
Simple tests confirm the product works and is safe. These may include:
- Zip, button and snap function tests
- Seam strength pull tests
- Colour rub test with a white cloth
- Barcode scan test
- Carton drop test
- Needle or metal detection where required
Step 10: Labels and packing check
The inspector checks care labels, size labels, fibre content and country of origin. In the EU, fibre content labels must follow the EU Textile Labelling Regulation. They also check polybags, folding, hangtags and carton weight.
Step 11: Closing meeting
The inspector shares the main findings with the factory. The factory can explain or question a finding before the report is sent.
After the Inspection
Step 12: Report and decision
You receive a report with a result for each section and photos of every defect type. You then choose to release, hold or ask for rework. If the lot fails, the factory sorts and repairs the goods, and you book a re-inspection.
Pre-Shipment Inspection Checklist
Use this short checklist as a starting point for your own form.
| Area | What to check | Result |
|---|---|---|
| Quantity | Packed quantity vs PO, carton count | Pass / Fail |
| Packing | Carton marks, assortment, polybags | Pass / Fail |
| Workmanship | Critical, major and minor defects at agreed AQL | Pass / Fail |
| Measurements | Key points vs size chart and tolerance | Pass / Fail |
| Colour | Shade vs approved sample, shade within lot | Pass / Fail |
| Function | Zips, buttons, snaps, closures | Pass / Fail |
| Labels | Care, size, fibre, origin, barcodes | Pass / Fail |
| Safety | Sharp objects, needle detection, PPE marking | Pass / Fail |
Common Mistakes to Avoid
- Booking the visit before goods are packed
- Not sending the approved sample or tech pack
- Changing AQL levels on the day
- Letting the factory choose which cartons to open
- Ignoring minor defects that keep coming back order after order
How Integrated Overseas Helps
Our inspectors follow this procedure on every pre-shipment inspection in India, Bangladesh, Vietnam and Laos. You get a digital report with photos and GPS proof, usually the same day. For the full picture, read our complete guide to pre-shipment inspection.
Need a checklist built for your product? Contact our team.
FAQs
How long does a pre-shipment inspection take?
Most garment inspections take one working day. Large orders or many styles may need two inspectors or a second day.
What is a pre-shipment inspection form?
It is the checklist the inspector follows. It lists each area to check, the AQL levels and the result for each section.
Can the factory choose the sample?
No. The inspector must pick cartons and pieces at random from the whole lot. This keeps the result fair.
What happens if goods are not ready on the day?
The inspector records how much is packed. If it is far below 80 percent, you may need to rebook the visit.
